English

français

 

2006

2007

 

Time Schedule - 2005 - Caledrier général

September/septembre

Mon./lun.
Tue./mar.
Wed./mer.
Thu./jeu.
Fri./ven.
Sat./sam.
Sun./dim.
 
1 2 3 4
C. Ratcliffe/NRC
2.5 mm MAS probe high-speed MAS
5 6 7     N2 refill 8 9 10 11
D. Bryce/UofO, V. Terskikh/900
Low-gamma static probe installation and testing
V. Terskikh/900
12 13 14    N2 refill 15 16 17 18
M. Monette/Bruker
3.2 mm MAS probe installation
V. Terskikh/900
Low-gamma static probe installation and testing

19

20   He refill

21    N2 refill

22

23

24

25

V. Terskikh/900
field drift measurements
V. Terskikh/900
37Cl/1H 3.2 mm MAS probe
D.Brouwer/NRC
13C/1H 2.5 mm MAS probe
26 27 28    N2 refill 29 30
   
I. Moudrakovski, D.Brouwer/NRC
V. Terskikh (manager) is away till Oct. 4 for Avance Maintenance training

October/octobre

Mon./lun.
Tue./mar.
Wed./mer.
Thu./jeu.
Fri./ven.
Sat./sam.
Sun./dim.
 
 
1 2
I. Moudrakovski/NRC
5 mm low-gamma static probe
3 4 5     N2 refill 6 7 8 9
 I. Moudrakovski/NRC
5 mm low-gamma static probe
10 11 12    N2 refill 13 14 15 16
 I. Moudrakovski/NRC
13C/1H 2.5 mm MAS probe
V. Terskikh/900
1H 3.2 mm MAS probe

17

18   He refill

19    N2 refill

20

21

22

23

V. Terskikh/900
1H 3.2 mm MAS probe
24 25 26    N2 refill 27 28 29   30
D. Brouwer/NRC
QCPMG 2.5 mm MAS probe
V. Terskikh/900
SpectroGrid
31  
SpectroGrid

November/novembre

Mon./lun.
Tue./mar.
Wed./mer.
Thu./jeu.
Fri./ven.
Sat./sam.
Sun./dim.
 
1 2     N2 refill 3 4 5 6
V. Terskikh/900
SpectroGrid / QCPMG low-gamma static probe
7 8 9     N2 refill 10 11 12 13
 P. Aguiar, P. Sidhu / University of Manitoba
2.5 mm MAS probe, high-speed MAS, MQMAS
14 15   He refill 16    N2 refill 17 18 19 20
Brouwer/NRC
2.5 mm MAS
V. Terskikh/900
2.5 MAS temperature calibration
I. Moudrakovski/NRC
5 mm low-gamma static probe

21

22

23    N2 refill

24

25

26

27

Agilent
V. Terskikh/900
3.2 mm MAS probe testing
R.Wasylishen/University of Alberta
2.5 mm MAS probe, high-speed MAS
28 29 30    N2 refill
     
 I. Moudrakovski/NRC
5 mm low-gamma static probe

December/décembre

Mon./lun.
Tue./mar.
Wed./mer.
Thu./jeu.
Fri./ven.
Sat./sam.
Sun./dim.
  
 
1 2 3 4
V. Terskikh/900
3.2 mm MAS probe testing
V. Terskikh/900
field drift measurements
5 6 7     N2 refill 8 9 10 11
 J. Ripmeester/ NRC
2.5 mm MAS probe,
13C/1H, VT
V. Terskikh/900
3.2 mm MAS probe
12 13 14  He/N2 refill 15 16 17 18
D. Brouwer/NRC
2.5 mm MAS probe
I. Moudrakovski/NRC
5 mm low-gamma static probe

19

20

21   N2 refill

22

23

24

25

D. Bryce/University of Ottawa
3.2 mm MAS probe
J. Ripmeester/ NRC
2.5 mm MAS probe
26 27 28   N2 refill
29  
30 31  
J. Ripmeester/ NRC
3.2 mm MAS probe
G. Wu/Queen's University
3.2 mm MAS probe
V. Terskikh/900
3.2 mm MAS probe